RW12-15KV

Zhejiang Jiuguang Electric Power Technology Co., Ltd. located in the famous scenic spot south of the country, close to Ningbo-Taizhou-Wenzhou Expressway, and 104 National Road phase, superior geographical environment, transportation convenience.Our main production isolating switches, vacuum circuit breakers, load switch, operating mechanism, such as high-voltage electrical products, domestic products have reached the advanced level, and passed ISO9001: 2000 international quality system certification. National high-voltage electrical Quality Supervision and Inspection Center. The factory to innovation, quality win for the purpose. Has a number of highly qualified technical staff, complete production equipment and advanced testing equipment, to provide customers with high-quality products and quality service.
Add:Niqian Industrial Zone, Liushi Town, Yueqing City, Zhejiang Province
Fax:086-0577-62601830
Serverphone:086-400-8070-830
Tel:086-0577-62602830
Photo:086-13736777007
E-mail:qydl66@163.com
  • Desciption
General
Drop-out fuse and pull the load drop-out fuse is outdoor high-voltage protection of electrical. It is installed in high-voltage side of the distribution transformer or the Support Link of the distribution line as Transformers and lines short circuit, overload protection, and open, co-load current. Drop-out fuse is made by the insulating bracket and fuse tubes, static contact is installed at both ends of the insulation bracket, Moving contact installed on both ends of fuse tube, Fuse tube is composed by inner arc tube and outer phenolic paper tube or epoxy glass cloth tube. Pull load drop-out fuse can enhance flexibility auxiliary contacts and arc chute for open, co-load current.
When drop-out fuse in the normal operation, the fuse tube with fuse tension to form the closed position. When the system fails, the fault current blown fuse quickly, And form of arc, arc tube by the electric arc burning, Decompose large amounts of gas, formed a high pressure in the tube, and formed vertical wind along the pipeline, The arc was quickly stretch and elongated. After fuse blows, the moving contact lose tension and turned out, locking mechanism, release fuse tube, fuse tube drop, formed breaking Position. When pull the load, use insulating rod to pull the moving contact. At this point, the moving and the static contact is still contact. Continued pull the contact with the insulating rod, the auxiliary contacts are separated. the arc appear between the auxiliary contacts, and was stretch in the hood slit, the arc cover has gas, when the current is 1, the arc goes out.
Use and Standards
This product is used in 11 ~ 35KV distribution lines branching lines and distribution transformers primary side, For overload and short circuit protection Separation and Combination the rated load current.
The product model by JB/T8321-1996《Method of type AC high-voltage fuses》 prepared. Product parameters made by GB15166.3-1994 《high voltage fuses Expulsion fuses》standards. The standards are not clearly defined the important parameters and configuration, According to JB/DQ2139-1986《11 ~ 35KV outdoor high voltage drop fuse interim technology 》requires correction.
Conditions of Use
Ambient temperature: not higher than +41 ℃, not less than -31 ℃
Altitude: not exceed 1111m (1111m above can be corrected GB311.1-1997)
Power frequency: 51 ± 2Hz
Earthquake intensity: 7 degrees below
Maximum wind speed: 35m/s
Technical Parameters
12KV-15KV
Type Rated Volage (kV) Rated Current (A) Breaking Current (A) Impulse Volage (BIL) Power- frequency withstand Voltage (kV) Leakage distance (mm) Weight (kg) Dimensions (cm)
RW12 12 111 6311 111 42 231 7.5 41×31×12.5
RW12 12 211 12511 111 42 231 8



REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Name
Email*
Whatsapp
Message*